2.17.2007

Friday Night at the Dojo 2/16

Kim and I stooped by the dojo to do some sheetrock repair. We'd had a leak in the upstairs plumbing a while back. The fix seemed to be working, so the damage needed to be corrected. A little tape, a little mud, a couple of screws and some labor.

Had to try to do it quietly as the Iaido class was in progress.

0 comments: